Project

Glengall Road

Precast construction delivers programme savings against the academic calendar on a constrained site

Glengall Road is a new build, higher education development in Peckham which provides 2375mĀ² of educational workspace, amenities and commercial areas as well as 676 rooms of student accommodation. Located adjacent to Burgess Park, the site is located within the wider Old Kent Road Area Action Plan and has a previous history of industrial use.

The scheme consists of 15 storeys plus a basement and provides courtyards, roof terraces and external spaces tying into the public realm. The structure is a combination of insitu concrete frame at the lower levels and precast walls and slabs for the levels housing the accommodation above.

The site is located over an existing power tunnel and a new power tunnel which was constructed at the same time as the groundworks were carried out. This involved extensive liaison with National Grid to obtain the Asset Protection Agreement by inputting into the tunnel impact assessment and monitoring strategy for the new and existing tunnels. The substructure is designed to transfer the loads over the exclusion zones below.

Walsh were involved at an early stage to input into the building layout. Larger loads from the taller parts of the building were kept away from the area over the power tunnels to limit the impact on the transfer structure. Likewise, the basement was moved to avoid the area over the tunnel exclusion zones to limit the required excavation depth and thus limit the amount of material to be removed from site, saving on cost and programme.

Client 
  • Equans
Architect 
  • Willmore Iles
Contractor 
  • FP McCann
  • Oliver Connell & Son
Completion Date2024

Please click on images below to open a full-screen gallery.

Explore Related Projects

Student Accommodation

Chapter London Bridge

Innovating city student living through MMC [...]

Read more

Student Accommodation

Wembley Park Plot NE01

Using lean design to reduce embodied carbon on large PBSA scheme [...]

Read more

Residential

Paddington Green Police Station

Wind-tunnel testing and temporary works design reduces high-rise concrete volumes & embodied carbon [...]

Read more

Mixed Use

Harold Hill Family Welcome Centre

Structural scheme designed for future-proof adaptation [...]

Read more

Student Accommodation

Palmerston Court

MMC innovations & Passivhaus standards [...]

Read more

Healthcare

Springfield Hospital

Lean design delivers significant savings on time and materials [...]

Read more

Taking Sustainability Seriously

Sustainability is in our DNA and we have our own ambitious goals to achieve Net Zero as a business and with our designs. With innovative in-house monitoring tools, Walsh clients have seen on average reductions of 10-20% total embodied carbon, with some of our flagship work achieving 60-70% reductions compared with baseline figures.