Project

Greenford Quay

Delivering volumetric modular and civils design on a multi-phase development to meet evolving compliance standards

Walsh was employed on multiple phases of the Greenford Quay development, taking on the Stage 2 design by Meinhardt and taking individual plots and external landscaping to Stage 3 Tender to inform the Employer Requirements. Following contractor appointment Walsh was retained as the Clientā€™s Engineering Consultant, undertaking a client monitoring role for construction and subsequent handover.

The volumetric modular buildings consist of residential layouts above a ground floor retail and commercial area with a lower ground car park. Volumetric modular MMC was not part of the development at planning so when MMC was brought in on each block post-planning, we had to be creative in introducing transfer structure for the modules while maintaining the building height. Walsh were able to design lean and efficient transfer structures to meet the requirements of the specialist modular manufacturer while maintaining the architectural flair of front of house areas, providing the structural intent, employerā€™s requirements and ongoing monitoring.

Many of the plots interface closely with the levels and geometry of spine roads completed during the enabling works in 2019, as well as discharging drainage to the enabling works sewer network. The site falls around 9m from the north-east corner down to the canal. With the Stage 3 design for the final plots commencing in 2023, a significant amount of time had passed since their construction and as such Walsh had to deliver creative design solutions which maintained Part M compliance around buildings whilst tying into the as-built spine roads.

The final block to be developed was the existing ā€˜Glaxo Buildingā€™, a Grade II listed building which was formerly the headquarters for Glaxo Smith Kline. The existing building will be used as a pop-up event space before being developed further and repurposed so, in an effort to keep final costs to a minimum, Walsh worked with the design team to incorporate as much of the final landscaping into the temporary scheme without impacting the ā€˜meanwhileā€™ use or final design.

Client 
  • Greystar
Architect 
  • HTA
Contractor 
  • Tide Construction
Completion Date2025
Greenford Quay Overview Shot
Greenford Quay Shot from the Water

Explore Related Projects

Student Accommodation

Chapter London Bridge

Innovating city student living through MMC [...]

Read more

Residential

83 Barchester Street

Revitalising a site of industrial heritage for modern living and community-focused design [...]

Read more

Residential

Paddington Green Police Station

Wind-tunnel testing and temporary works design reduces high-rise concrete volumes & embodied carbon [...]

Read more

Mixed Use

101 Camley Street

Tailoring a new-build for commercial, life sciences fit-out [...]

Read more

Mixed Use

Harold Hill Family Welcome Centre

Structural scheme designed for future-proof adaptation [...]

Read more

Student Accommodation

Palmerston Court

MMC innovations & Passivhaus standards [...]

Read more

Taking Sustainability Seriously

Sustainability is in our DNA and we have our own ambitious goals to achieve Net Zero as a business and with our designs. With innovative in-house monitoring tools, Walsh clients have seen on average reductions of 10-20% total embodied carbon, with some of our flagship work achieving 60-70% reductions compared with baseline figures.