Hawley Wharf, Building A0

Retaining a façade to seamlessly integrate with the broader Hawley Wharf masterplan

As part of the Hawley Wharf masterplan, the façade of Building A0 needed to be retained as part of planning requirements and integrated into a series of new-build four-storey, terraced commercial units that were being built on the plot. Walsh carefully co-ordinated with the temporary works designer and overcame a number of challenges to successfully deliver this project.

Retaining the front, rear, and one flank wall of the existing structure, the remainder of the building within these boundaries was selectively demolished including party-walls between properties. Walsh designed a new steel frame which could be erected within the existing walls and the existing façade could then be tied back to this steel frame.

As the original front wall at ground floor was only supported on a series of timber beams and brick piers typical of the building’s era, this needed to be removed in it’s entirety. Walsh designed new box frames which could be installed and provide adequate support for the front façade at level one and above.

To maximise the commercial space, the basement was lowered, so we designed a construction sequence that allowed the existing walls to be underpinned.

The result is new commercial units which seamlessly blend into the vibrant urban fabric of the surrounding area.

Client 
  • Labtech
  • Stanley Sidings Ltd.
Architect 
  • AHMM
Contractor 
  • Mace
Completion Date2019
Sectors 
Location 
  • Camden
  • London

Explore Related Projects

Commercial

Morton House

Transforming an early 1900’s building, with a comprehensive fit-out and historic building renovation [...]

Read more

Commercial

127 Charing Cross Road

Extra storeys and a remodel whilst nightclub remained operational on ground floor [...]

Read more

Commercial

Clarendon Centre

Regeneration and repurposing of an urban shopping centre [...]

Read more

Historical Buildings

Claridge’s

Innovative design allows upwards extension & triple basement construction [...]

Read more

Retail

80 Oxford Street

Complex temporary works on extremely confined site [...]

Read more

Taking Sustainability Seriously

Sustainability is in our DNA and we have our own ambitious goals to achieve Net Zero as a business and with our designs. With innovative in-house monitoring tools, Walsh clients have seen on average reductions of 10-20% total embodied carbon, with some of our flagship work achieving 60-70% reductions compared with baseline figures.